The deflecting weir has usually an L form positioned on the bottom of the tundish.
Weirs are cast with refractory, vibrated concretes.
The concrete mix quality is set, depending on cast sequences and steel temperatures.
This type of weir helps the homogeneity of steel bath in the tundish and improves the steel flow.