The tundish dam is shaped and pre-cast to fit correctly the safety lining measurements.
The bottom of the dam may include a trench to empty a maximum of steel out of the tundish, at the end of the sequence.
Dams are cast with refractory, vibrated concretes.
The concrete mix quality is set, depending on cast sequences and steel temperatures.